/ Residential · Commercial · Multi-Family

Finished work. Documented in daylight.

Every project here was photographed on-site, in natural light, at completion. Stucco, stone, siding, and waterproofing systems — specified and installed across Tampa Bay.

Before photo of a Florida residential exterior with deteriorating original stucco, visible cracking and discoloration along the facade, natural daylight, no people, documentary framing
Before photo of a Florida residential exterior with deteriorating original stucco, visible cracking and discoloration along the facade, natural daylight, no people, documentary framing
After photo of the same Florida residential exterior, fully re-stuccoed with smooth finish and new architectural foam trim at windows and roofline, natural afternoon daylight, no people, documentary framing
After photo of the same Florida residential exterior, fully re-stuccoed with smooth finish and new architectural foam trim at windows and roofline, natural afternoon daylight, no people, documentary framing
Before photo of a commercial building exterior in Tampa Bay with faded and damaged EIFS cladding, visible moisture staining and impact damage on the facade panels, natural daylight, no people
Before photo of a commercial building exterior in Tampa Bay with faded and damaged EIFS cladding, visible moisture staining and impact damage on the facade panels, natural daylight, no people
After photo of the same commercial building exterior with new Nichiha fiber cement panel system installed, clean horizontal lines, architectural reveals at floor transitions, natural Florida daylight, no people
After photo of the same commercial building exterior with new Nichiha fiber cement panel system installed, clean horizontal lines, architectural reveals at floor transitions, natural Florida daylight, no people
+ Before & After

Full scope. Same structure. New system.

Before
After

Cracked and delaminating stucco system. Original finish failing at window reveals and base coat. Tampa residential project.

Full re-stucco with three-coat system, new foam trim profiles at all openings, and waterproofing at base. Texture matched to adjacent surfaces.

Before
After

Failing EIFS cladding on a St. Petersburg commercial facade. Moisture intrusion at panel seams and window heads. System at end of service life.

Full Nichiha panel replacement with air-barrier membrane and new flashing at all penetrations. Reveal joints sealed to Florida Building Code requirements.

Ready to spec your exterior system?

We review scope, confirm materials, and deliver a detailed estimate — no generic bids. Serving Tampa Bay, Sarasota, Lakeland, and surrounding areas.